PREPARING FOR
YOUR LOGICOURT
LogiCourt will have a manufacturer’s representative on site for training during the installation process. We will
also, provide a tutorial to your facility’s personnel on
the proper way to install, care for, and disassemble
the court.
PRIOR TO INSTALLATION
Prior to installation, there will be some work that you need to do
to prepare:
-
Trim doors
-
Remove thresholds and cove base
-
Adjust goals and bleacher
-
Level slab
-
Abatement
DURING INSTALLATION
Your LogiCourt system will be delivered in a dry van truck. You will need
to have a forklift available to unload the panels. We recommend having
a two to four person crew for installation. The more people, the faster installation goes!
Please consider finding the easiest access for bringing the panels into your facility. We recommend a double door where the middle divider can come out. The ability to use a pallet jack to unload will save a lot of time and effort as well.
AFTER INSTALLATION
After your LogiCourt is installed, you will need to add or replace:
-
Door thresholds
-
Perimeter cove base
-
Transition ramps
DETAILS
The specifications for each LogiCourt panel is:
-
Size: ~4’ x 7’
-
Profile height: 2 ¾”
-
Weight: ~135 lbs
We are dedicated to making your basketball court installation process as simple and stress-free as possible. Our expert team has compiled a comprehensive guide taking you through every step of the installation process. From preparation to the big day itself, we guide you through the process to ensure your installation is foolproof. Our commitment to your satisfaction means that we take pride in assisting you every step of the way, starting with a free consultation to discuss your needs.